Find the drawing for the building
Use the city’s building-records page. Choose the archive by the date of the drawing you need. An 1890 house with a 1990s foundation repair can appear in two different collections.
- Drawings made before 1905: search the Stadsarchief image collection (Beeldbank) by street and house number.
- For 1905–2010: open Bouwdossiers 1905–2010 bekijken, enter the address, choose Adressen, then Adresgegevens and Bouwdossiers. Try the main house number as well as the flat number.
- For later work: use the borough contact on the city page or call 14 020. Give the street, house number, approximate year and type of permit you need.
A palenplan shows the intended pile layout. A heistaat is a pile-driving record. A drawing headed funderingsherstel concerns foundation repairs. Match its footprint to the part of the building you intend to buy. Ask the seller for the completion paperwork if the file contains only a proposal.
Check whether the front wall is still settling
Amsterdam has installed survey bolts (meetbouten) in façades across much of the area inside the A10 ring. Open the city’s map from its foundation-information page. Under Hoogte, switch on the meetbouten layers, zoom to the façade and select the bolt number. Write down the first and last measurement dates as well as the reported movement.
Amsterdam recommends a foundation investigation if measured settlement exceeds 3 mm per year. Repeated measurements of the same bolt show how far that point on the wall has moved. A series that ended years ago tells you what happened during those years. If the seller says the building has since stabilised, ask for later readings and the report interpreting them. If readings disagree between the front and the rear, ask a foundation specialist to explain the difference.
What the water level can tell you
When groundwater drops below the highest foundation timber, oxygen can reach the wood and fungi can attack it. Some piles are also vulnerable to bacterial degradation while submerged. To interpret a groundwater record, a specialist needs the elevation of the timber and readings over time. The water level you see in the canal can differ from the groundwater level beneath the house.
Buying upstairs? Ask the owners’ association (VvE) for the latest foundation report and the minutes discussing it. If a survey or repair is pending, ask which addresses it covers, what the owners have approved and whether the association has already asked owners to pay. Use the VvE cost guide to work out your share.
Questions at an Amsterdam viewing
Do all Amsterdam canal houses stand on the same piles?
No. Adjacent houses can have different foundations. Check the historic file and the paperwork for later alterations.
Can I look up an apartment without knowing its archive number?
Yes. Start with the street and house number in the relevant city collection. For flats, try the base address and check the range of numbers named on each file.
The map has no bolt on the façade. What should I ask for?
Ask the owner or VvE for private monitoring records and any foundation investigation. A blank spot gives you no measurement for that façade.
Do I need to worry about an old sloping floor?
A slope shows a difference in level. To establish whether movement continues, ask for dated, comparable measurements. A specialist can interpret those alongside the structure and any cracks.
Does a repair to the rear extension cover the main house?
Check the outline and specification on the repair drawing against the main walls. Ask for the completion documents and an explanation of any walls left on their original support.
